LBG, Canons House (Bristol)
LBG, Canons House (Bristol)
OVERVIEW

A 42 week multi-million pound mechanical services design and upgrade for a large office complex in order to incorporate increased occupancy.Numerous crane lifts were required due to the inaccessibility of the roof.


THE RESULT

Works included:• Installation of new chiller plant (including associated pipework/ pump sets/ pressurisation units and control panels) • Fan coil unit (550no) replacement and LTHW pipework modifications • Floor diffuser installation/ relocation • Controls install (local zone controls and temp sensors) • Sanitaryware and extraction to toilet areas • Domestic services and above ground drainage to toilet areas