OVERVIEW
As part of a refurbishment project to part of the hospital we carried out the following works:Heating - stripping back of existing heating services as required.
THE RESULT
Installation of:• Radiators/ radiant panels & modification of existing LTHW pipework as required • LTHW fan coils and connection to existing LTHWVentilation - strip out of existing ventilation and fume cupboardsInstallation of:• Heat recovery ventilation unit • Wall fans to various areas • Air transfer grilles (connected to the fire alarm system where necessary to close in event of fire)Public Health Services - existing drainage and domestic hot and cold water services stripped back and capped to suit fit out works.Installation of:• Sink and Vulcathene waste system • Sanitaryware with services extended to various locations suit the new layout and TMV’s installed as required • Zip hydro tap and water heater to various locations and trace heating as required